Laserfiche WebLink
® • Establish understandings between emergency response teams, emergency <br /> response contractors, and equipment suppliers for smooth coordination of <br /> emergency response actions. <br /> 5.12 EVACUATION PROCEDURES <br /> During and/or after an incident, the SSO in consultation with other emergency <br /> personnel, such as the Fire Department, will assess the potential for injury to any <br /> persons located on adjacent properties. If the assessment concludes that an <br /> imminent threat to public health is possible, an evacuation of the nearby area <br /> will be initiated. Situations, which warrant partial or complete evacuation of site <br /> personnel and/or local residents, are as follows: <br /> • Explosions resulting in airborne debris including particles and large fragments. <br /> • Fires that cannot be readily contained or are spreading to other parts of the <br /> facility; or when fire could generate highly toxic fumes, or create a danger of <br /> igniting potentially explosive substances which may be stored on-site. <br /> The SSO will immediately notify the responding Police/Sheriff Department and <br /> all other appropriate emergency response agencies. The SSO will check that the <br /> entrance gate is unlocked and locked as required. <br /> 5.13 MEDICAL CARE PROCEDURES <br /> Should an emergency situation result in personal injury, immediate steps will be <br /> taken to determine the cause and extent of the injury and to render first aid. The <br /> SSO will be notified in all cases and the paramedics will be called when <br /> required. If further medical attention is necessary, the injured person will be <br /> transported to the nearest medical facility. <br /> 5.14 AMENDMENTS TO THE EMERGENCY RESPONSE PLAN <br /> The ERP will be reviewed and can be amended, in accordance with the criteria <br /> listed in 27 CCR, Section 21130(c). The amendment criteria are as follows: <br /> • A failure or release occurs for which the plan did not provide an appropriate <br /> response. <br /> • The post-closure use and/or structures on the site change and these changes <br /> are not addressed in the existing plan. <br /> Forward Landfill FPCPCMP 5-6 <br /> ):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 5.doc:6/9/2005 <br />