Laserfiche WebLink
7.0 PROFESSIONAL CERTIFICATION OF ACCURACY <br /> Current regulations require that a registered civil engineer or a certified engineering <br /> geologist prepare and certify the accuracy of closure plans for.all Class II landfills. The <br /> Forward Landfill Stage IA Partial Final Closure/Post-Closure Maintenance Plan has been <br /> prepared in accordance with 27 CCR, Chapters 3 and 4, and 40 CFR, Part 258, as certified <br /> by Mr. Bryan Stirrat, a California Registered Civil Engineer, Registration Number C 22631. <br /> Respectful itted: <br /> 9ROFESS/ � <br /> ERYAN A. <br /> STIRRAT <br /> 22631 <br /> Exp. 12-31-06 �k <br /> CI L <br /> Brya A. Stirrat, P.E. <br /> R.C.E. No. C 22631 <br /> Forward landfill PFCPCMP 7-1 <br /> ):\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\FL-sec 7.doc:6/9/2005 <br />