My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2005_6
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2005_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 5:41:08 AM
Creation date
7/3/2020 10:50:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2005_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2005_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 6 <br /> FORWARD LANDFILL <br /> CLOSURE COST ESTIMATE SUMMARY <br /> STAGE IA PARTIAL CLOSURE AREA <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE ESTIMATED COST <br /> M <br /> 11 ENGINEERING DESIGN(4) <br /> 1 Is $85,000 $85,000 <br /> Subtotal $85,000 <br /> 12 CON TRUCTION MANAGEMENT 5 <br /> 4%of construction cost 1 Is $73,692 <br /> Subtotal $73L692 <br /> Total Construction Cost $2,107,483 <br /> Contingency 20% $421,497 <br /> Total Closure Cost Estimate $2,528,980 <br /> Notes: <br /> (1) Costs for preparation and compaction of the existing one foot of foundation is included in this item. <br /> (2) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one <br /> foot of soil would already be in place. <br /> (3) No cost is included in this category because the system is currently in-place and/or no modification is required <br /> as part of the Stage IA partial closure. <br /> (4) Cost is for engineering design and preparation of construction documentation(plans and specifications)for <br /> bid purposes. <br /> (5) Cost is for monitoring contractors work,coordinating CQA activities,meetings,liaison between design <br /> engineers and contractors,etc. <br /> Forward Landfill PCPCMPR <br /> J:\Allied\Forward\2005.0051 Partial Closure\Partial Closure Plan\ClosCst.XLS;Revision 1:6/14/2005 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.