My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2006-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
CORRESPONDENCE_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2025 2:07:00 PM
Creation date
7/3/2020 10:50:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2006-2009
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006-2009.tif
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL INFLATION FACTOR 2006 <br /> FACILITY NAME: FACILITY NO.: <br /> Multiply each cost estimate by the inflation factor to determine the new adjusted cost estimates as illustrated <br /> below. <br /> The ABC Landfill's COST ESTIMATE for CLOSURE in 2006 was$2,000,000. Using the 2006 inflation factor of <br /> 1.029, they recalculated their ADJUSTED CLOSURE COST for 2007 to$2,058,000. Their 30-year COST <br /> ESTIMATE for POSTCLOSURE MAINTENANCE in 2006 was$1,500,000. Using the 2006 inflation factor of <br /> 1.029, their ADJUSTED POSTCLOSURE MAINTENANCE COST for 2007 is$1,543,500. Their cost estimate for <br /> corrective action in 2006 was$1,000,000. Using the 2006 inflation factor of 1.029, they recalculated their <br /> ADJUSTED CORRECTIVE ACTION COST for 2007 to$1,029,000. <br /> Closure estimate $2,000,000 X1.029 = $2,058,000 <br /> 30-year Postclosure estimate $1,500,000 X1.029 = $1,543,500 <br /> Corrective Action $1,000,000 X1.029 = $1,029,000 <br /> Using the inflation factor for 2006, calculate the following: <br /> $ X 1.029 = $ <br /> Closure Costs estimate in 2007 dollars <br /> $ X 1.029 = $ <br /> Annual Postclosure Costs X 30 years estimate in 2007 dollars <br /> $ X 1.029 = $ <br /> Corrective Action Costs estimate in 2007 dollars <br /> I certify under penalty of perjury under the laws of the State of California that the information in this document is <br /> true and correct to the best of my knowledge and is being provided in accordance with the regulations. <br /> Operator/Owner Signature Title of Person Signing <br /> Mailing Address Printed Name of Person Signing <br /> Phone Number Date of Report <br /> Thank you for providing this information. <br /> California Environmental Protection Agency <br /> Printed on Recycled Paper <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy <br /> consumption. For a list of simple ways you can reduce demand and cut your energy costs, see our Web site at <br /> http://www,ciwmb.ca.p-ov <br />
The URL can be used to link to this page
Your browser does not support the video tag.