Laserfiche WebLink
6 9 <br /> The site will be routinely inspected for leachate seeps from the landfill <br /> slopes. The inspections will be performed daily and any observed <br /> leachate seeps will be recorded in the inspection log. If seeps are <br /> observed, the site engineer will be contacted and the cause of the seep <br /> will be investigated. The LEA will also be notified. <br /> Remedial measures will be designed and implemented to control leachate <br /> seeps. The remedial action plan will be submitted to the LEA for review <br /> and approval, prior to implementing the plan. <br /> 5. WMUs <br /> All constructed WMUs at the site have been approved for disposal by the <br /> Regional Water Quality Control Board (RWQCB). <br /> 6. Disposal Treatment Areas <br /> The WMUs that may receive waste during the winter of 2008-2009 include <br /> FU-03, FU-04, FU-05, FU-06, and FU-08 (once regulatory approval <br /> obtained). <br /> 7. Access <br /> Roads necessary for the safe operation of Forward Landfill during <br /> inclement weather are graded in such away as to promote drainage and <br /> direct water to a central collection point. Roads are winterized with <br /> asphalt, road base, crushed concrete, gravel and recycled asphalt. <br /> A truck tire wash has been installed along the main landfill entrance road. <br /> In addition, roads will be cleaned, as needed, to prevent the build up of <br /> mud and tracking of mud onto Austin Road. Austin Road will be cleaned, <br /> as needed, by sweeper truck and water truck. <br />