Laserfiche WebLink
TABLE <br /> FORWARD LANDFILL <br /> SWRCB JTD INDEX <br /> o � <br /> Design Report-preliminary and as-built plans ' 21760(a)(1) As Built plans will be <br /> submitted to the RWQCB <br /> l upon completion of the <br /> j I landfill or any portion <br /> I thereof. <br /> .............._.._.......___.._..........._......._...___...____.....___..._.._.................. ..._._...._._.. _.._------ <br /> __-.._.._.__.___.__.___.-'------.-----.____..__.___.____....__.._._.. <br /> Design Report ! 21760(a)(3)- 6.0-pp.6-1 thru 6-3 1, <br /> (a)(4) 17.1, 7.2, 7.3- pp. 7-1 thru <br /> 10 <br /> 6.0thru 6-31, <br /> Operation Plan i 21760(b)-(b)(3) <br /> i 7.0-pp.7-1 thru 7-21 <br /> .. .. .. .. ... _..... ... . .... .......... . .........._..........._._.........__--------__.E_'—'---._. .....-_ _...__._._._._..-....__..__....._.._._..____...._...._.g .. <br /> j Subchapter 4. Development of Closure/Post-Closure Maintenance Plans <br /> '21769. SWRCB-Closure and Post-Closure Maintenance Plan Requirements. I <br /> Prelim.CI/P-CI Plan-purpose 21769(b)(1) Appendix L <br /> _. __..._.._.._.----...._.__...._. .. _. __ ____.._.... <br /> I Appendix L <br /> Prelim.CI/P-CI Plan Contents-cost analysis ; 21769(b)(2)- <br /> (b)(2)(B)5. <br /> NA <br /> Final CI/P-CI Plan ; 21769(c)- <br /> —_.._.___.......__..._........__......__....._.._..._..._.__._:.__._...._-.......----. ...._._.._€__(c)(2)(H)3. ......................................._....... <br /> ._ <br /> Chapter 5. Enforcement <br /> Article 4. Enforcement by Regional Water Quality Control Board (RWQCB) "* <br /> _._..._.. _..—..' -...- <br /> ......----............................._.........._.................._.. _..... —_—r -------_.__..____.._._.._...�._._._......_ ._........._.._.......................... <br /> ._._..__ — <br /> '22190. SWRCB-Mandatory Closure(Cease and Desist 22190(b) If early closure <br /> Orders). i mandated:IWMD will <br /> f comply with RWQCB <br /> ' orders <br /> I <br /> Chapter 6. Financial Assurances at Solid Waste Facilities and at Waste Management <br /> Units for Solid Waste <br /> Subchapter 2. Financial Assurance Requirements <br /> Article 1. Financial Assurance for Closure <br /> J <br /> ( ) ; Section 5.4 of Appendix <br /> 22207. SWRCB-Closure Funding Requirements. i 22207(a) L <br /> Article 2. Financial Assurance for Postclosure Maintenance I <br /> Section 5.4 of Appendix <br /> '22212. SWRCB-Post-Closure Funding Requirements. 22212(a) i <br /> L <br /> i <br /> Article 4. Financial Assurance Requirements for Corrective Action <br /> .................................... ......... ........................._....._.................................__._..._.._......... _.. --.-._.. _ _, _ _ _.-_. _...... <br /> '22222. SWRCB-Corrective Action Funding Requirements. 1 22222 The current WDRs are <br /> located in Appendix A i <br /> 7 9 7.2.4-pp 7-6 thru <br /> i <br /> f <br /> Forward Landfill JTD 7 of 7 <br /> J:\Allied\Forward\JTD Amendment\january2006 JTD Amendment\SWRCBIDX.doc:05/23/02) <br /> Amendment No.1: 1/25/2006 <br /> BRYAN A.STIRRAT&ASSOCIATES <br />