Laserfiche WebLink
comparison of the performance of the alternative cover to the published performance <br />characteristics of prescriptive final covers in similar environmental settings and will be <br />the key database used to support the use of this system elsewhere on the site. <br />CONCLUSION <br />On the basis of the initial characterization and modeling, it is concluded that the <br />deviations from the CQA plan identified during final cover construction do not constitute <br />a significant nor problematic change in the final cover material characteristics. <br />RECOMMENDATIONS <br />On the basis of the above conclusion, it is recommended that: <br />The final cover constructed over the north and northeast slopes of the Forward <br />landfill be approved as constructed; <br />Additional modeling be completed to verify that the slight difference in material <br />characteristics does not significantly impact the anticipated performance of the <br />system, and; <br />Final cover system performance monitoring be implemented as originally <br />proposed. <br />® CLOSURE <br />F1 <br />This letter is presented has been prepared in accordance with generally accepted <br />geotechnical practices in and makes no other warranties, either express or implied. This <br />letter has not been prepared for use by parties or projects other than those named or <br />described above, and may not contain sufficient information for other parties or other <br />purposes. <br />GeoLogic Associates <br />Gary L. Lass <br />President <br />euros-iwsz 1/06106._ <br />