My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_15
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:51:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_15
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_15.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I 7E "TOR <br />ENGINEERING, INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number. <br />Forward Landfill Closure <br />021605.06 <br />45 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, Ca <br />Ruben Ramirez <br />October 18, 2005 <br />Tuesday <br />General Contractor. <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />GSE <br />BAS <br />General Foreman: <br />Liner Superintendent: <br />Others: <br />Larry Simms <br />Source and Description of Fill Material <br />Weather. <br />CQA Technician: <br />On site native brown silty Clay <br />Warm, mostly clear and breezy <br />Ken Davila <br />Equipment on site: I <br />2-Sheepsfoot rollers, 2 -water trucks, 2-D6 dozers, 8-627 scrapers, 1-140 blade <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I arrived on site today for observations and documentation at the job location listed above. Guinn <br />Construction continued using eight (8) scrapers to haul subgrade fill from the southern cut area east of the <br />FU -05 cell. One scraper broke down in the mid afternoon. The scrapers placed fill material from east to <br />®west along the piggy back slope. One dozer, with GPS, and the sheepsfoot roller worked with the scrapers. <br />The other dozer and sheepsfoot worked on the north slope fill area in anticipation of the hydroseeding. The <br />water trucks moisture conditioned the haul roads and the cut area. Pictures were taken of the settlement <br />markers and test pits to verify clay thicknesses on the north slope closure area. <br />Twenty-five (25) nuclear moisture density tests were performed on the material placed on the piggy back <br />slope. All tests passed the specified values in density and moisture content and the on site foreman was <br />verbally informed of the test results. The last of the permeability samples, P-18, was send to the Vector <br />laboratory for off site testing. <br />A GSE crew of five was on site to unload two trucks of GCL and pallets of bentonite in the morning and <br />filled sand bags for the rest of the day. <br />0 Prepared By: Reviewed By: Mt <br />4!23,03. Rcv. 0 1 of 1 <br />C-? <br />
The URL can be used to link to this page
Your browser does not support the video tag.