Laserfiche WebLink
_E TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 51 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste July 24, 2006 Monday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW),high 70's to hi h100's Mike Strobel <br /> Equipment on site: <br /> 4x627 scrapers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator,rock truck, loader, backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. GSE continued/finished deployment of 60-mil single-sided textured HDPE in the upper area of WMU <br /> FU-06; doing the south and north berms today. GSE also off-loads geosynthetics. <br /> Today's deliveries: Truck load# 10, w/11 rolls Bentofix. <br /> Truck load# 11, w/10 rolls Bentofix and 18 bags of bentonite. <br /> Truck load# 12, w/9 rolls DST 60-mil and 1 rubsheet. <br /> 2. Gwinn Construction starts placement of the Clay Liner in the lower area of WMU FU-06. Pre <br /> conditioned material is collected from the east area stockpile by scrapers, spread in "thin" 4"-6" loose <br /> lifts, followed by additional moisture conditioning and compaction equipment. <br /> II. Testing <br /> 1. Monitored activities by GSE: observed trial weld, deployment, panel seaming and air pressure testing. <br /> Panels 4 through 10 deployed on the south berm and panels 11 through 14 deployed on the north berm, <br /> covering 25,284 ft2 today. Liner deployed to date= 39,846 W. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: wwvuu Reviewed By: �G <br /> 1 of 1 4/23/03,Rev.0 <br />