Laserfiche WebLink
TZE TOR <br /> ENGINEERING,INC. <br /> ® DAILYN T <br /> CO S FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 56 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste July 31,2006 Monday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, it. breeze (N ), high 50's to high 90's Mike Strobel <br /> Equipment on site: <br /> 4x627 scra ers, 2xD6 dozers, 815 compactor, 2 water trucks, excavator, rock truck, loader,backhoe, forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> 1. Construction <br /> 1. Gwinn Construction continued placement of the Clay Liner in the lower area of WMU FU-06. <br /> 2. Continued deployment filter geotextile and placement of the Granular Drainage materials along the <br /> inside of the berms in the northern portion of FU-06. <br /> I. Testing <br /> 1. Performed 11 FDT's in compacted Clay Liner, tests CL-43 through CL-53; all passed. <br /> 2. Performed sand cone test SCCL-44. <br /> 3. Collected Shelby Tube permeability samples; tests SCCL-43A and STCL-4313. <br /> III. Conversations <br /> • None listed. <br /> Prepared By: Reviewed By: <br /> 1 of 1 4/23/03,Rev. 0 <br />