Laserfiche WebLink
ir/T VoR <br /> ENGINEERING,INC. <br /> MOISTURE-DENSITY SUMMARY <br /> Project Name: Forward Landfill WMU FU-06 <br /> Project No: 02.1605.07 Subgrade Review by: <br /> Test Location Soil Information Field Testing Information Specification <br /> Test Test No. Northing Easting Elevation Sample DDmax Optimum Wet Moisture Dry % % Moisture PIF Remarks/retest <br /> Date or or or No. (pci Moisture Density Content Density Comp Comp Content <br /> Grid No. Grid No. Lift No. % c % c <br /> 5/30/06 SG-24A 52' SGP-2 115.8 12.9 124.3 19.3 104.2 90 90 -4 to+4 P retest o.k. <br /> 5/30/06 SG-25 53' SGP-2 115.8 12.9 125.4 19.6 104.8 91 90 -4 to+4 P <br /> 5/31/06 SG-26 54' SGP-2 115.8 12.9 118.1 22.4 96.5 83 90 -4 to+4 F <br /> 5/31/06 SG-26A 54' SGP-2 115.8 12.9 125.9 18.7 106.1 92 90 -4 to+4 P retest o.k. <br /> 5/31/06 SG-27 43' SGP-1 116.8 14.3 124.7 18.1 105.6 90 90 -4 to+4 P <br /> 6/1/06 SG-28 46' SGP-1 116.8 14.3 125.1 19.0 105.1 90 90 -4 to+4 P <br /> 6/1/06 SG-29 46' SGP-1 116.8 14.3 126.2 18.6 106.4 91 90 -4 to+4 P <br /> 6/1/06 SG-30 46' SGP-1 116.8 14.3 127.1 17.9 107.8 92 90 -4 to+4 P <br /> 6/1/06 SG-31 47' SGP-1 116.8 14.3 124.4 18.3 105.2 90 90 -4 to+4 P <br /> 6/1/06 SG-32 49' SGP-1 116.8 14.3 125.9 17.1 107.5 92 90 -4 to+4 F <br /> 6/1/06 SG-33 50' SGP-1 116.8 14.3 125.7 17.9 106.6 91 90 -4 to+4 P <br /> 6/2/06 SG-34 49' SGP-1 116.8 14.3 123.9 17.1 105.8 91 90 -4 to+4 P <br /> 6/2/06 SG-35 51' SGP-1 116.8 14.3 124.7 18.2 105.5 90 90 -4 to+4 P <br /> 6/2/06 SG-36 52' SGP-1 116.8 14.3 125.2 16.9 107.1 92 90 -4 to+4 P <br /> 6/2/06 SG-37 52' SGP-1 116.8 14.3 123.7 17.3 105.5 90 90 -4 to+4 P <br /> 6/2/06 SG-38 48' SGP-1 116.8 14.3 123.9 18.1 104.9 90 90 -4 to+4 P <br /> 6/2/06 SG-39 52' SGP-1 116.8 14.3 125.1 17.7 106.3 91 90 -4 to+4 P <br /> 6/2/06 SG-40 52' SGP-1 116.8 14.3 126.2 17.4 107.5 92 90 -4 to+4 P <br /> 6/5/06 SG-41 8' SGP-3 115.0 13.8 125.7 20.1 104.7 91 90 -4 to+4 P <br /> 6/5/06 SG-42 7' SGP-3 115.0 13.8 118.7 19.7 99.2 86 90 -4 to+4 F <br /> 6/5/06 SG-43 6' SGP-3 115.0 13.8 117.9 18.7 99.2 86 90 -4 to+4 F <br /> 6/5/06 SG-44 8' SGP-3 115.0 13.8 123.3 17.9 104.6 91 90 -4 to+4 P <br /> 6/5/06 SG-45 7' SGP-3 115.0 13.8 124.1 18.2 105.0 91 90 -4 to+4 P <br /> 6/5/06 SG-46 6' SGP-3 115.0 13.8 125.2 17.4 106.6 93 90 -4 to+4 P <br /> 6/5/06 SG-47 73' SGP-3 115.0 1 13.1_j_122.1 17.9 103.6 90 90 -4 to+4 P <br /> 4/23/03, Rev. 0 Page 2 of 5 <br />