TOR <br /> IF ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 30 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 23,2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), low 70's to mid 100's Mike Strobel <br /> Equipment on site: <br /> 4x637 scrapers, D6 dozer, 815 compactor,water truck, excavator, rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued deployment of the bottom geotextile along the eastern termination of FU-05 and west floor <br /> area of FU-06. <br /> 2. Continued placement of the Granular Drainage material over 8 oz. geotextile in the NEC of FU-06; <br /> contractor using a belt-conveyor to get the gravel onto the geotextile where the D6 pushes out a 6" lift <br /> ® using GPS control. Working in the SEC of the upper area of FU-06 this a.m. <br /> II. Testing . <br /> 1. None taken. <br /> III. Conversations <br /> • None listed. <br /> Prepared y: Reviewed By: <br /> 1 of 1 4/23/03,Rev.0 <br />