17E TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 32 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 27,2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Overcast, It. breeze (NW), mid 60's to high 90's Mike Strobel <br /> Equipment on site: <br /> 4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader,backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued deployment of the bottom geotextile along the eastern termination of FU-05 and west floor <br /> area of FU-06. <br /> 2. Continued placement of the Granular Drainage material over 8 oz. geotextile in the NEC of FU-06; <br /> contractor using a belt-conveyor to get the gravel onto the geotextile where the D6 pushes out a 6" lift <br /> using GPS control. Working in the south-central portion of the upper area in FU-06 this a.m. <br /> 03. Start placement of the 1' thick Operations Layer over 8 oz. filter geotextile and 6" of Granular <br /> Drainage material; starting in the SWC of the upper area from access in FU-05. <br /> II. Testing <br /> 1. Monitored activities. <br /> 2. Probed at roughly 50' centers for minimum 6" of Granular Drainage material placed along the west <br /> side of FU-06. <br /> III. Conversations <br /> • With Larry Simms, Gwinn Construction, re: Contractor given approval to deploy 8 oz. Filter <br /> Geotextile and to start placement of the Operations Layer along the west side of FU-06. <br /> Prepared By: Reviewed By: <br /> I of 1 4/23/03,Rev.0 <br />