VE TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 35 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 30, 2006 Friday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Native soils Clear, It. breeze (NW), low 70's to high 90's Mike Strobel <br /> Equipment on site: <br /> 4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued deployment of the bottom geotextile down the east-central portion of FU-06 upper area. <br /> 2. Continued placement of the Granular Drainage material over 8 oz. geotextile in the southern portion of <br /> FU-06 upper area. <br /> 3. Continued placement of a 1' thick lift of Operations Layer over 8 oz. geotextile; work in the northwest <br /> portion of the upper area this a.m. 0 <br /> II. Testing <br /> 1. Monitored activities. <br /> 2. Checked the thickness of the Granular Drainage material throughout the central portion in the upper <br /> area of FU-06. <br /> III. Conversations <br /> • None listed. <br /> • <br /> Prepared by aq., Reviewed By: <br /> 1 of 1 4/23/03,Rev. 0 <br />