Laserfiche WebLink
SECTION 7 <br /> References <br /> Brian A. Stirrat Associates(BAS)et al.,Joint Technical Document,Forward Landfill,June 2003. <br /> Brian A. Stirrat Associates(BAS)et al.,Design Report for the Waste Management Unit(WMU)FU- <br /> 03 and WMUF-West,Forward Landfill,August 2003. <br /> Brian A. Stirrat Associates(BAS)et al.,Design Report for the Waste Management Unit FU-04, <br /> Forward Landfill,April 2004. <br /> Brian A. Stirrat Associates(BAS)et al.,Design Report for the Waste Management Unit FU-05, <br /> Forward Landfill,February 2005. <br /> Bray,J.D.,et al.,"Simplified Seismic Design Procedure for Geosynthetic-Lined, Solid Waste <br /> Landfills,"Geosynthetics International,Vol. 5,Nos 1-2, 1998. <br /> CH2M HILL,Comprehensive Landfall Description, Forward Landfill Inc., January 1992. <br /> CH2M HILL,Design and Construction Documents, WMU D-93,Forward Inc.Landfill,April 1993, <br /> (1993a). <br /> CH2M HILL,Report of Waste Discharge, 1993 Permit Revisions, Forward, Inc. Landfill, San <br /> Joaquin County,California,June 1993,(1993b). <br /> C112M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward,Inc. Landfill, San <br /> Joaquin County,California,September 1993,(1993c). <br /> C112M HILL,Construction Quality Assurance Report, WMU D-93, Forward,Inc.Landfill,January <br /> 1994,(1994a). <br /> C112M HILL,Buena Vista Landfill, Module 3. Design, Construction, and Operations Documents. <br /> Prepared for County of Santa Cruz,March 1994,(1994b). <br /> C112M HILL,Design and Construction Documents, WMU D-94,Forward Inc.Landfill,June 1994, <br /> (1994c). <br /> CH2M HILL,Buena Vista Landfill, Module 3. Construction Quality Assurance Report. Prepared for <br /> County of Santa Cruz,November 1994,(1994d). <br /> CH2M HILL, Construction Quality Assurance Report, WMU D-94, Forward, Inc. Landfill,December <br /> 1994, (19944). <br /> CH2M HILL,Preliminary Closure and Post-Closure Maintenance Plan, Forward,Inc.Landfill, San <br /> Joaquin County,California,Revised December 1994,(1994e). <br /> CH2M HELL,Design and Construction Documents, WMUD-95,Forward Inc. Landfill,January <br /> 1995,(1995a). <br /> CH2M HILL,Construction Quality Assurance Report, WMUD-95, Forward Inc.Landfill, October <br /> 1995,(1995b). <br /> C112M HILL,Clay Versus GCL Base Liner Memorandum, Figure 2B,February 24, 1997,(1997a). <br /> WMU FU-06 REPORT6 �7-1 <br />