Laserfiche WebLink
0 ® 1 EC0 <br />ENGINEERING, I1VC. <br />GEOSYNTHETIC RECEIVING AND MAN UFACTU RINGICONFORMANCE LOG <br />(one type of material per sheet) <br />Project Name: Forward LF FU -06 Material Type: - 8 ozlsy Geotextile <br />Project No: 021605.07 <br />Review by: - MA -C <br />Receiving <br />Lot Number <br />Roll Number <br />Prefix and Suffix <br />Sheet <br />Area <br />(sy) <br />Cummulative <br />(soDate <br />MQC <br />Received <br />Date <br />MQC <br />Results <br />(P/F) <br />CQA <br />Conformance Conformance <br />Test Date Ship Results (P/F <br />(or NP if not or NA) <br />perform) <br />Approved for <br />Installation <br />(YIN) <br />13 -Jun -06 <br />1 519757 <br />13022 <br />2026 <br />9,000 <br />738,000 <br />23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2027 <br />9,000 <br />747,000 <br />23 -Jun -06 <br />P <br />I <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2028 <br />9,000 <br />756,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2029 <br />9,000 <br />765,000 <br />23 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />1 2030 <br />9,000 <br />774,000 <br />24 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2031 <br />9,000 <br />1 783,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2032 <br />9,000 <br />792,000 <br />23 -Jun -06 <br />P <br />5 -Jun -06 P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2033 <br />9,000 <br />801,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2034 <br />9,000 <br />810,000 <br />23 -Jun -06 <br />P I <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2035 <br />9,000 <br />819,000 <br />23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2036 <br />9,000 1 <br />828,000 <br />23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2037 <br />9,000 <br />837,000 <br />23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2038 <br />9,000 <br />846,000 <br />23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />1 2039 <br />9,000 <br />855,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2040 <br />9,000 <br />864,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2041 1 <br />9,000 <br />873,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2042 <br />9,000 <br />882,000 <br />23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2043 <br />9,000 <br />891,000 <br />23 -Jun -06 <br />P I <br />5 -Jun -06 P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2044 <br />9,000 <br />900,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2045 1 <br />9,000 <br />909,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2046 <br />9,000 <br />918,000 <br />23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2047 <br />9,000 <br />927,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2048 <br />9,000 <br />936,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />1 2049 <br />9,000 1 <br />945,000 <br />23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />2050 <br />9,000 <br />954,000 <br />23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />2051 <br />9,000 <br />963,000 <br />23 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2052 <br />9,000 <br />972,000 <br />24 -Jun -06 <br />P <br />Y <br />4of8 <br />