Laserfiche WebLink
U <br />Project Name: <br />Project No: <br />ENGINEERING, INC. <br />GEOSYNTHETIC RECEIVING AND MANUFACTURING/CONFORMANCE LOG <br />(one type of material per sheet) <br />Forward LF FU -06 Material Type: .8 ozlsy Geotextile <br />Review by: - MAC <br />Receiving <br />Date <br />Lot Number <br />Roll Number <br />Prefix and Suffix <br />Sheet <br />Area <br />(sy) <br />Cummulative <br />(sf) <br />MQC <br />Received <br />Date <br />MQC <br />Results <br />(P/F) <br />CQA <br />Conformance <br />Test Date Ship <br />(or NP if not <br />perform) <br />Conformance Approved for <br />Results (P/F Installation <br />or NA) (YIN) <br />21 -Jun -06 <br />519757 <br />13022 <br />2854 <br />9,000 <br />1 1,215,000 <br />24 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2855 <br />9,000 <br />1,224,000 <br />24Jun-06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2856 <br />9,000 <br />1,233,000 <br />24 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2857 <br />9,000 <br />1,242000 <br />24 -Jun -06 <br />P <br />Y <br />21 -Jun -06 1 <br />519757 <br />13022 <br />2858 <br />9,000 <br />1,251000 <br />24 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2859 <br />9,000 <br />1,260000 <br />24 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2860 <br />9,000 <br />1269,000 <br />24 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2861 <br />9,000 <br />1,278 000 <br />24 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2862 <br />9,000 <br />1,287000 <br />24 -Jun -06 <br />P <br />Y <br />19 -Jun -06 <br />519757 <br />13022 <br />2863 <br />9,000 <br />1296,000 <br />23 -Jun -06 <br />P <br />Y <br />19 -Jun -06 <br />519757 <br />13022 <br />2864 <br />9,000 <br />1,305,000 <br />23 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2865 1 <br />9,000 <br />1 1314,000 <br />24Jun-06 <br />P <br />Y <br />19 -Jun -06 <br />519757 <br />13022 <br />2866 1 <br />9,000 <br />1323,000 <br />23 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2867 <br />9,000 <br />1,332000 <br />24 -Jun -06 <br />P <br />Y <br />21 -Jun -06 <br />519757 <br />13022 <br />2868 <br />9,000 <br />1,341000 <br />24 -Jun -06 <br />P <br />Y <br />14 -Jun -06 <br />519757 <br />13022 <br />2869 <br />9,000 <br />1,350 000 <br />23 -Jun -06 I <br />P <br />Y <br />19 -Jun -06 <br />519757 <br />13022 <br />2870 <br />9,000 <br />1,359 000 <br />23 -Jun -06 <br />P <br />16 -Jun -06 <br />P Y <br />14 -Jun -06 <br />519757 <br />13022 <br />2871 <br />9,000 <br />1,368000 <br />23 -Jun -06 <br />P <br />Y <br />14 -Jun -06 <br />519757 <br />13022 <br />2872 <br />9,000 <br />1,377,000 <br />23 -Jun -06 <br />P <br />Y <br />14 -Jun -06 <br />519757 <br />13022 <br />2873 <br />9,000 <br />1,386,000 <br />23 -Jun -06 <br />P <br />Y <br />14 -Jun -06 <br />519757 <br />13022 <br />2874 <br />9,000 <br />1,395,000 <br />23 -Jun -06 <br />P <br />Y <br />14 -Jun -06 <br />519757 <br />13022 <br />2875 <br />9,000 <br />1,404,000 <br />23 -Jun -06 <br />P <br />Y <br />14 -Jun -06 <br />519757 <br />13022 <br />1 2876 <br />9,000 <br />1,413000 <br />23 -Jun -06 <br />P <br />Y <br />14 -Jun -06 <br />519757 <br />13022 <br />2877 <br />9,000 <br />1,422,000 <br />23 -Jun -06 <br />P <br />Y <br />19 -Jun -06 <br />519757 <br />13022 <br />2878 <br />9,000 <br />1431,000 <br />23 -Jun -06 <br />P <br />Y <br />14 -Jun -06 <br />519757 <br />13022 <br />2879 <br />9,000 <br />1,440,000 <br />23 -Jun -06 <br />P <br />Y <br />14 -Jun -06 1 <br />519757 1 <br />13022 <br />1 2880 1 <br />9,000 <br />1449,000 1 <br />23 -Jun -06 <br />P <br />Y <br />6of8 <br />