Laserfiche WebLink
IF/E "TOR <br />PV ENGINEERING, INC. <br />0 DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />7 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />May 23, 2006 <br />Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />In-place native soils <br />Scat. clouds, it. breeze, high 50's to high 70's <br />Michael Strobel <br />Equipment on site: <br />2x637 scrapers, D6 dozer, 815 compactor, water truck, 12G blade <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued exposing the east edge of the liner in FU -05, using the backhoe, loader and 2 laborers. <br />2. Continued construction of the new temporary berms in the north area of FU -06, using scrapers to <br />deliver and place material from the berm removed from the east side of FU -05.. <br />3. Continued placement for the 5:1 slope above the bench; scrapers place material from the "wedge" <br />stockpile in FU -06; the D6 dozer trims the outside slope and works in the borrow. <br />I. Testing <br />1. Completed pounding Proctor Compaction on sample SGP -1. <br />2. Performed 6 EDT's (Field Density Tests -nuclear method) in compacted Subgrade soils placed on the <br />5:1 slope; tests SG -1 through SG -6 indicate "passing" results similar to previous work here. <br />3. Performed 2 FDT's in compacted fill for the new temporary berms in the north area of FU -06; both <br />tests indicate passing results. <br />III. Conversations <br />• With Larry Simms, Gwinn Construction, re: Discussed scraper quantities, load times, etc. <br />Prepared By: <br />Reviewed By: Ot L <br />1 of 1 4/23/03, Rev. 0 <br />