Laserfiche WebLink
VECTOR <br />NGINEERINQINC. <br />REPORT0 DAILY CONSTRUCTION FIELD <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />18 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 8, 2006 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Import <br />I Scat. clouds, breeze (NW), high 50's -high 80's. <br />Mike Strobel <br />Equipment on site: <br />3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Contractor continued placing Subgrade fill on the east floor area of FU -06. <br />2. The 12G blade works on the base of the 5:1 slope. <br />H. Testing <br />1. Performed 2 FDT's in compacted subgrade being placed in the east floor of FU -06; tests SG -59 and <br />SG -60; both tests indicate passing results. <br />2. Completed Atterberg Limits on sample SG -1; material classified as CL (lean clay). <br />III. Conversations <br />• Attended construction meeting. <br />Prepared By: <br />Reviewed By: <br />1 of 1 4/23/03, Rev. 0 <br />