VTOR <br />E <br />NGINEERINGINC. <br />DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />21 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 12, 2006 <br />Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Import <br />Cloudy-ovrest, breezy (SW), high 50's to high 70's <br />Mike Strobel <br />Equipment on site: <br />3x637 scra ers, D6 dozer, 815 com actor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued placement of Subgrade fill along the east side of the floor area, FU -06. <br />2. Continued detail work atop FU -06; prepare to deploy geotextile. <br />3. Contractor has started butt -fusion welding the 3" diameter perforated HDPE LCRS pipes. <br />II. Testing <br />40 1. Performed 3 FDT's in compacted Subgrade; tests SG -64, -65 and -66. All tests passed. <br />2. Received first shipments of 8 oz. geotextile: Truck load #1, 30 rolls; truck #2, 30 rolls, truck #3 with <br />27 rolls and truck #4, 27 rolls. The material arrived on flat beds and was off-loaded using a fork lift. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: &G <br />1 of 1 4/23/03, Rev. 0 <br />