Laserfiche WebLink
V77 <br />CTOR <br />NGMEERINQ INC. <br />L V" DAILY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />30 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />June 23, 2006 <br />Friday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />Liner Superintendent: <br />Other: <br />Larry Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native soils <br />I Clear, It. breeze (NW), low 70's to mid 100's <br />Mike Strobel <br />"utpment on site: <br />4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />11 <br />Construction <br />1. Continued deployment of the bottom geotextile along the eastern termination of FU -05 and west floor <br />area of FU -06. <br />2. Continued placement of the Granular Drainage material over 8 oz. geotextile in the NEC of FU -06; <br />contractor using a belt -conveyor to get the gravel onto the geotextile where the D6 pushes out a 6" lift <br />using GPS control. Working in the SEC of the upper area of FU -06 this a.m. <br />0 I. <br />Testing <br />1. None taken. <br />III. Conversations <br />• None listed. <br />Prepared By: <br />Reviewed By: Nt <br />1 of 1 4/23/03, Rev. 0 <br />