Laserfiche WebLink
V TV <br />ME /.Ej TOR <br />E/ <br />PF ENGINEERING, INC. <br />0 DAILY CONSTRUCTION/ REPORT <br />Project Name: <br />Project No. <br />Report Sequence <br />Forward WMU FU -06 <br />02.1605.07 <br />43 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Stockton <br />Allied Waste <br />July 14, 2006 <br />Friday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Reviewed By: <br />Gwinn Construction <br />n/a <br />Monte Christie <br />General Foreman: <br />liner Superintendent: <br />Other: <br />L Simms <br />n/a <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />Native soils <br />Clear, It. breeze (NW), high 60's to low 100's <br />Mike Strobel <br />Equipment on site: <br />4x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe, forklift <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />I. Construction <br />1. Continued placement of the Operations Layer over 8 oz. geotextile; work into the southeast portion of <br />the upper area this a.m. <br />2. Continued excavation for the sump in the lower floor area subgrade. <br />II. Testing <br />0 1. Monitored activities. <br />III. Conversations <br />• With Larry Simms, Gwinn Construction, re: Expect arrival of liner next Monday. <br />Prepared By: <br />Reviewed By: <br />1 of 1 4/23/03, Rev. 0 <br />