My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_5
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:52:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_5
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_5.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,ruv.u4.4uuo 10£Uu <br />n <br />$131U Y.U13 <br />LTE TOR <br />ENGINEERING,, INC. <br />re �1r�d t3.w.. <br />1 Y' <br />►d MASTRI• ► •'' <br />Project No. <br />02, 16051,07 --�,— 59 <br />C;licnt Or i anagcr Datc: Boy pr'I'he Week: <br />Allied Wafite August 3, 2006 Thursday <br />l enerla LAITI6rUMIT: t..InCr C7pntra0141r. 1'r:rject Hngineer - Rov�OW ls.7. <br />Gwinn Construction r,/a Monte Christie <br />t rencral Foretnain: Lhear Superintendent: other: <br />Larry Simms n/a <br />\mlrce wnd lkscriplionof Pill Material: Weather. �. <br />Native soils Clear, It. breeze (NW), hi0i 50's to mid 90'5 <br />Lyuipmrnt on site: <br />4x627 scrapers, 2xD6 doors, 815 compactor, 2 water tnicks, excavator, rock thick, loader, <br />NOTES (Describe work completed during the clay, any probleom and their solutions): <br />T. C;onstrtwtion <br />1. Gwinn Construction . continued placcincnt of the Clay Liner in the lower area of WMU FU -06. <br />Detailing the forth and final lifts this a.m. <br />2. Completed placement of the Operation Layer soils in rile Northern Portion of FU -06 this worning. <br />3. Surveyors shoot the Operations Layer soils in the Northern Portion ofFU-06. <br />T. Testing <br />I. Perlornied In FDT's in compacted Clay Liner; tests C1-120 through CL -130. All tests met or <br />exceeded specification requirements. <br />2. Collected Shelby Tube permca.bility samples STC:T,-120 A kind B. <br />3. Perflormed Sand Crone test SCCL-121. <br />4. Collected Clay Liner Proctor sample CLP -5 for field laboratory moisture -density tests. <br />111. C:ortversaliuns <br />• With Monte Christie, Vector Engineering, Inc., re: Discussed completion of the Nurthern Poilion <br />in FTJ-06- all photos, daily reports, and liner information is complete. <br />Reviewed fay <br />I of 1 4/23/0:3, Rev. 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.