Laserfiche WebLink
,ruv.u4.4uuo 10£Uu <br />n <br />$131U Y.U13 <br />LTE TOR <br />ENGINEERING,, INC. <br />re �1r�d t3.w.. <br />1 Y' <br />►d MASTRI• ► •'' <br />Project No. <br />02, 16051,07 --�,— 59 <br />C;licnt Or i anagcr Datc: Boy pr'I'he Week: <br />Allied Wafite August 3, 2006 Thursday <br />l enerla LAITI6rUMIT: t..InCr C7pntra0141r. 1'r:rject Hngineer - Rov�OW ls.7. <br />Gwinn Construction r,/a Monte Christie <br />t rencral Foretnain: Lhear Superintendent: other: <br />Larry Simms n/a <br />\mlrce wnd lkscriplionof Pill Material: Weather. �. <br />Native soils Clear, It. breeze (NW), hi0i 50's to mid 90'5 <br />Lyuipmrnt on site: <br />4x627 scrapers, 2xD6 doors, 815 compactor, 2 water tnicks, excavator, rock thick, loader, <br />NOTES (Describe work completed during the clay, any probleom and their solutions): <br />T. C;onstrtwtion <br />1. Gwinn Construction . continued placcincnt of the Clay Liner in the lower area of WMU FU -06. <br />Detailing the forth and final lifts this a.m. <br />2. Completed placement of the Operation Layer soils in rile Northern Portion of FU -06 this worning. <br />3. Surveyors shoot the Operations Layer soils in the Northern Portion ofFU-06. <br />T. Testing <br />I. Perlornied In FDT's in compacted Clay Liner; tests C1-120 through CL -130. All tests met or <br />exceeded specification requirements. <br />2. Collected Shelby Tube permca.bility samples STC:T,-120 A kind B. <br />3. Perflormed Sand Crone test SCCL-121. <br />4. Collected Clay Liner Proctor sample CLP -5 for field laboratory moisture -density tests. <br />111. C:ortversaliuns <br />• With Monte Christie, Vector Engineering, Inc., re: Discussed completion of the Nurthern Poilion <br />in FTJ-06- all photos, daily reports, and liner information is complete. <br />Reviewed fay <br />I of 1 4/23/0:3, Rev. 0 <br />