My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2007_14
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2007_14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 2:51:20 AM
Creation date
7/3/2020 10:52:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2007_14
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2007_14.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The tip of each prong has been sharpened to -make it <br />easier to push the probe in - be careful idth the sharp tips! <br />The probe maybe difficult to insert into extremely <br />9 <br />ECH2O Probe User's Manual <br />3. Installing the Probes <br />then use the Installation kit with extension rods to <br />install the probe. <br />2. Use a thin implement like a trenching shovel, garden- <br />ing spade, or flat bar to make a pilot hole in the soil. <br />Then insert the probe into the hole, making sure the <br />entire length of the probe is covered. Finally, insert the <br />shovel again into the soil a few inches away from the <br />probe, and gently force soil toward the probe to pro- <br />vide good contact between the probe and the soil. For <br />deeper installation, excavate down to the level you <br />to install described. <br />wish measure, then the probe as <br />For the EG5: <br />1. Insert the probes into the soil, making sure that the <br />prongs are buried completely up to the black over - <br />molding, as shown below <br />f <br />i• �f• <br />k6 <br />i <br />The tip of each prong has been sharpened to -make it <br />easier to push the probe in - be careful idth the sharp tips! <br />The probe maybe difficult to insert into extremely <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.