Laserfiche WebLink
Drain Gauge User's Manual <br />2. Installing the Drain Gauge <br />3. After the lower section is installed, check to make sure <br />it is roughly level. Apply a 2 cm (3/4 in.) thick layer of <br />diatomaceous earth (included in your Drain Gauge kit) <br />on top of "the fiberglass fabric. The diatomaceous <br />earth will enhance the contact between the soil in the <br />DCT and the fiberglass wick. Note: in order to make <br />sure there is enough space beneath the Drain <br />Gauge for proper drainage, DO NOT pound the <br />wick tube into the ground. This can lead to <br />improper drainage and potentially clog the drain- <br />age ports. <br />Figure 8: Lower nick section installed <br />