Laserfiche WebLink
i] <br />Drain Gauge User's Manual <br />2. Installing the Drain Gauge <br />filling the syringe. Note: The syringe will never completely <br />fill with water. <br />NOTE: The liquid in the yringe will be a mix of the all the water <br />that has collected in the reservoir over time. You should not assume <br />that the composition of the sample water is specific to a single flush <br />event from the reservoir, unlessyou are certain thatyou have emptied <br />the reservoir since the previous flush. <br />Water Balance <br />It is often useful to install ECHO soil moisture probes <br />within the divergence control tube to observe how the <br />water content changes with depth over time in the DCT. <br />If you install ECHO probes in the DCT, you must take <br />care so they are not touching any part of the DCT, as this <br />will adversely affect the readings. A good rule of thumb is <br />to locate them as close to the center of the divergence <br />tube as possible. <br />C <br />l <br />!I <br />C <br />0 <br />L <br />13 <br />C <br />u <br />