Laserfiche WebLink
Mr. Robert McClellan <br /> December 8, 2008 <br /> Page 9 <br /> ' A health and safety(H&S)plan for the well installation activities will be prepared prior to <br /> beginning the work. The H&S plan will describe potential hazards and will outline site-specific <br /> protection,monitoring and record keeping provisions. <br /> REPORTING <br /> An installation report will be prepared for submittal to FL following completion of the probe <br /> installations. The report will include a summary of all drilling and installation details, and will <br /> include boring logs documenting encountered geologic conditions and all probe construction <br /> details. <br /> CLOSING <br /> With this letter AWI seek approval of the existing LFG permimeter probe monitoring system, <br /> with alternative spacing and the addition of one probe, as described herein. AWI believes the <br /> upgraded perimeter probe monitoring system will provide satisfactory protection of the public <br /> health and safety and the environment from potential adverse impacts due to off-site LFG <br /> migration. Please contact Michael O'Connor at(707) 546-9461 if you have any questions or <br /> required any additional information. <br /> 1 <br /> ' Very truly yours, <br /> Oft <br /> Michael O'Connor Ambrose A. McCrea y,P.E. <br /> Project Professional Project Director <br /> SCS ENGINEERS SCS ENGINEERS <br />