My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_20
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_20
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_20.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
678
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AYPENDIX A <br /> tIMEIN6 9 =E.R1. $ PROTOCOL <br /> <FL'• <br /> The Sampling and AnalY= PPian (KIciafelder, Novemberl, 1994) ,describos how Forwar <br /> conducts groundwater monitoring for i:t a d <br /> ` , Inc. <br /> supercedoa con ed in the PIaa <br /> es s ` ns related to p ' and analysis in the ApriI 19$9 Postclosure <br /> Addendum #1 and Addendum. #2. a ion o and ex SamplingPlan, <br /> Procedures discussed in this methods and <br /> appendix,Kleinfelder Field Activities tocol,are an e,XC=pt of the <br /> more comprehensive Sampling and Analysis.plan. <br /> GROUNDWATER MONITORING. <br /> Monitoring Wells <br /> Equipment <br /> The groundwater monitoring wells at Forward are equipped with dedicated submerged Pumps for <br /> P ` g and collection group er les•- The field technicim p=fOnning.the zzn <br /> monitoring V411 have a list of cquipzneutthat-should available with which to complete.the ; <br /> monitoring.' The necessmy equipment is listed below list includes actual <br /> to purge and sample the wells in addition to tri `ve equipment <br /> � <br /> P gear that .must be worn for <br /> Protection and to reduce the potential for cross contamination of the vmUs and samples Sonic of <br /> the equipment used iuc various cahibra on, <br /> Cal <br /> 'bration <br /> procedures are discussed below.. <br /> Calibration Procedures - <br /> Many of the meters that are used in the field must be calibrated to P Ie results, The <br /> folio ' g discuss=calibration ratio e,pwcedures,and ftequency for the required <br /> cots. <br /> 8tWater C1'I.CYCI Ind2cator <br /> level indicators must'be calibrated arly to assure that data is notbeqng measured - <br /> Incorrectly due to the cable stretching. To cah-brat,. thewater level indicatorthe cable is run our <br /> to its entire lengtb and measured against a tape measure. Tbe a Point is the point on probe <br /> `ch completes the circuit when contacted by the water. Completed chvWt causes the <br /> .4@�V3949-FO A-1 July 14, <br /> 2000 <br /> 2Coo 6a,tnc , <br />
The URL can be used to link to this page
Your browser does not support the video tag.