Laserfiche WebLink
1. The pH, conductivity, and turbidity ',et will be calibrated at a minimum at the <br /> beginning of each sampling day using Commercially obtained.standards. ibxatiou <br /> WM <br /> be checked two to three times the day to evaluate the potential that the ca ibmtlon <br /> is driffins throughout the day. If instr=Ont drift is detected in the field, the <br /> me8suremerits taken during purging and sampling wM be a4lusted accordhWjy. Example <br /> calibration logs arse included in Ap ' and sampling of the wells <br /> the instuments will be used in the a manner as during cabination. <br /> 2. Depth to water will be measured again, prior to sampling, in each wellas described in <br /> Section 4A.I and recorded on the e Ctioa and Sample Log. The volume <br /> of groundwater in the well casing will be calaflated using the following equation(s): <br /> 4-inch welt- (Total Well Depth from. the mark on the well casing (ft} - DTw (ft}} x <br /> 0.653 gal/fL <br /> Prior to purging, the-watcr,will-be•. y- a dprsposabla.baHcr that is clear- <br /> enough to see through. Features such as immisdible Jaques will be noted and measured_ <br /> ^If immiscible layers-arm observed the veli will nct be purged prior to sampling. <br /> 4. -Mc well will then be purged using the a I m mps..Dile to the fact that the Pun WS <br /> must <br /> purge water from depths as great as-70 to 80 feet below ground svrfac,,- page ram range <br /> from 1/4 to 1 gallon per minute_ This�purgc,rate docs not appear to exceed the recharge <br /> rates• of the wells- Purge vra= will be dbch=gcd to-thee ground (see Section 4.4.6)_ <br /> DtPth to water measurcWamts WM be:taken pedoc'cally dudng purzjjL& The purpo=of <br /> Ome Measurements is to madtor-drawdown. If a decrease in groundwater elevation is <br /> the purge rate will be decreased un ':um a rate equals rrcbarge rate) - <br /> is achieved. The ficque:acy of measwntnent will be-once every five minutes hfrdaIIy <br /> d to once every one4mlfhouT o=equili-briumhas been <br /> reached- <br /> If equilibrium, be readied,it will be necemary to pmgce the well to dryness. Purge <br /> Ur1til less tb= 10%of the od8ftW volume of Water.=e= in the well. Hand bailing <br /> ,ay be rcquhvd to meet this objiWv— Monitor the DTW every 15 minutes to evaluate <br /> e. Start=Wleeollection'when dtha two feet of water has filled the well or-1.75 <br /> hours has CLapsed since the end of parsing. Pollect vaWe organics no later than two <br /> hoctrs after purging, Record all actions eats associated with purging a well. <br /> dry on the purge Characterization and Sample <br /> i <br /> 84940It23IOR32S M7 Ju 2000 <br /> 2040 I= IY l4 e <br />