Laserfiche WebLink
1.8.5 Gas Control System <br /> This category includes the cost of extension of the wells through the cover and <br /> lateral piping system modification during placement of the final cover system. <br /> 1.8.6 Site Security <br /> This category includes costs for required signage at closure of Stage VI or any <br /> lesser portion of the site. The site is currently enclosed with a perimeter fence and <br /> gates or has topographic constraints to prevent unauthorized access to the site <br /> property. <br /> 1.8.7 Demolition <br /> This category generally includes costs for dismantling and removal of on-site <br /> structures (i.e., fee booths and landfill scales). <br /> 1.8.8 Gas Migration Monitoring System <br /> This category assumes that all gas migration monitoring probes will be placed <br /> during active operations as required under 27 CCR, Sections 20921 through <br /> 20939. <br /> 1.8.9 Groundwater Monitoring System <br /> No costs are associated with this category since additional groundwater monitoring <br /> facilities are not proposed for the site at closure. <br /> 1.8.10 Enaineering Design <br /> This category includes costs for the preparation of construction level engineering <br /> design plans and specifications for bid purposes. This cost is assumed to be 1.5 <br /> percent of the construction cost. <br /> 1.8.11 Construction Management <br /> The construction management cost for the FL is based on the closure construction <br /> period. This cost is assumed to be 4 percent of the construction cost. <br /> 1.8.12 Partial Final Closure and Post-Closure Maintenance Plan Preparation <br /> This category covers the cost to prepare a Partial Final Closure Plan for the Stage <br /> VIII Closure area. <br /> 1.8.13 Contin ency <br /> A 20 percent contingency factor has been added to the construction cost estimate. <br /> 9 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Al lied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Clos Amend 3 Final.doc; <br /> Amendment No.3:7/1/2008) <br />