My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_24
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:53:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_24
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_24.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.9 Post-Closure Maintenance Cost Estimate <br /> The post-closure maintenance cost estimate previously prepared is not affected by <br /> the proposed changes included in this Amendment. The post-closure cost estimate <br /> is presented in Amendment No. 4 of the 2002 PCPCMP and reflects 2008 costs. <br /> The operator will initiate post-closure maintenance activities as the staged closure <br /> of the FL is implemented. The operator's understanding is that a minimum of the <br /> last thirty(30)years of post-closure maintenance must be funded. Therefore, the <br /> ongoing post-closure obligation under state law will continue for a minimum of 30 <br /> years after the Stage VIII closure area is completed. <br /> 1.10 Demonstration of Financial Assurance <br /> Closure and Post-Closure Maintenance Fund <br /> In accordance with 27 CCR, Chapter 6 and 40 CFR, Subpart G, an operator must <br /> demonstrate financial assurance for the proper closure, post-closure maintenance <br /> and corrective action for reasonably foreseeable releases at a landfill. An Insurance <br /> Policy demonstrating coverage for closure and post-closure maintenance costs has <br /> been evaluated and approved by the CIWMB for the FL. This closure cost estimate is <br /> reflected in 2008 dollars and prepared in accordance with 27 CCR regulations. Upon <br /> Aft approval of this Amendment(Amendment No. 3), the Closure Cost Estimate <br /> presented in Table 3 will serve as the basis for closure funding utilizing an approval <br /> financial assurance mechanism. <br /> 1.11 California Environmental Quality Act Documentation <br /> As discussed above, stand alone Partial Final Closure Plans will be prepared in <br /> advance of each closure stage. The operator will comply with CEQA and evaluate <br /> potential impacts associated with each staged closure project. Appropriate CEQA <br /> documentation will be prepared in support of obtaining agency approval of the Partial <br /> Final Closure Plans. <br /> 10 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\1N81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Clos Amend 3 Final.doc; <br /> Amendment No.3:7/1/2008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.