My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_25
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:27 PM
Creation date
7/3/2020 10:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_25
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_25.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.0 PRELIMINARY POST-CLOSURE MAINTENANCE PLAN AMENDMENT <br /> The 2002 Preliminary Plan prepared by BAS, Lewis Engineering, and GLA was updated <br /> with Amendment No. 4 of the PCPCMP. A copy of the updated post-closure <br /> maintenance cost estimate is included as Table 4 and matches the estimate <br /> presented in Amendment No. 4 of the 2002 PCPCMP. <br /> The FL will be closed in nine stages over the life of the landfill. Upon completion of <br /> closure construction activities and certification, partial closure post-closure monitoring <br /> and maintenance will begin. Post-closure monitoring and maintenance procedures <br /> are outlined in the 2002 PCPCMP. The following discussion presents items of special <br /> note which will be carried out during the post-closure maintenance period in support of <br /> each staged closure area where appropriate: <br /> Landfill Gas Control and Monitoring <br /> The landfill gas control system will be expanded as the FL is developed. Therefore, the <br /> gas control system will be placed prior to completion of each staged closure area. The <br /> system will be modified as discussed in this Amendment (Amendment No. 3) and the <br /> 2002 PCPCMP to accommodate placement of the final cover during Stage VII. <br /> Permanent gas migration monitoring probes have already been installed around the <br /> perimeter of the refuse footprint in accordance with 27 CCR. Additional probes may <br /> be added as necessary. <br /> Surface, subsurface and system monitoring and control system adjustments/ <br /> modifications will be conducted during post-closure maintenance to provide <br /> compliance with applicable regulations. <br /> Settlement Monitoring <br /> Two permanent survey monuments will be installed during closure of Stage I. An aerial <br /> survey will be conducted upon completion of each closure stage and once thereafter <br /> every five years during the post closure maintenance period to track settlement. If <br /> additional fill contour information is needed, it should be noted that aerial flyovers will <br /> be conducted annually throughout active refuse disposal operations. <br /> Stormwater Management <br /> As part of routine site maintenance, all stormwater control system features will be <br /> inspected and repaired as necessary. Special attention will be given to those interim <br /> and/or permanent stormwater control system features which divert, gather and/or <br /> control run-on to the staged closure areas. Drainage control system which features <br /> the final stage closure will be integrated with the interim features utilized during active <br /> operations. <br /> 11 <br /> Forward Landfill-PCPCMP Amendment <br /> (Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Clos Amend 3 Final.doc; <br /> Amendment No.3:7/1/2008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.