My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_25
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:27 PM
Creation date
7/3/2020 10:53:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_25
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_25.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.13 CLOSURE IMPLEMENTATION SCHEDULE <br /> 3.13.1 CLOSURE PROCESS <br /> As discussed in Section 1.5, Stage IA of the Forward Landfill will be closed in <br /> Summer 2005. Stage IA closure construction will begin with mobilization of <br /> equipment and materials. The type of equipment and required personnel <br /> expected to be utilized during closure construction includes but is not limited <br /> to, the following: <br /> • Equipment <br /> - Scrapers <br /> - Dozers <br /> Loaders <br /> - Compactors <br /> Trucks <br /> - Soil Screening Equipment <br /> - Motor Grader <br /> - Water Truck <br /> • Personnel <br /> Construction Manager <br /> - Field Inspector(s) <br /> - Engineer(s) <br /> - Geotechnical Engineer/Geologist <br /> - Geotechnical Technician(s) <br /> - Labor Crews <br /> - Equipment Operators <br /> - Surveyors <br /> Mechanics <br /> 3.13.2 CONSTRUCTION SCHEDULE <br /> The AVSL closure construction schedule includes the following tasks <br /> conducted over the corresponding time lines: <br /> Equipment Mobilization 2 weeks <br /> Interim/Foundation Layer Preliminary Grading 1-1/2 weeks <br /> • Placement of Monolithic Cover Layer 8 weeks <br /> Drainage Control Systems Construction 5 weeks <br /> • Survey/Settlement Monument Installation 1 week <br /> ® French Drain Leachate Seep Collector Installation 2 weeks <br /> Forward Landfill PFCPCMP 3-17 <br /> Z:\PROJECTS\Allied Waste\Forward\Reference Files Prior JTD\June 05 Stage IA Partial FCPCMP\FL-sec3.doc:6/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.