My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 10:54:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_3.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 8 <br /> FORWARD LANDFILL STAGE IA PARTIAL CLOSURE AEP <br /> ANNUAL OST-CLOSURE MAINTENANCE AND MONITORING <br /> COST ESTIMATE SUMMARY <br /> Item Unit Price Total <br /> No. Description 4uantity ($I ($, <br /> 1 FINAL COVER INSPECTION/MAINTENANCE AND REPAIR <br /> Inspection 12 hrs 50per/hr $600 <br /> Cover Repair - 5,000 LS $5,000 <br /> Subtotal $5,600 <br /> 2 LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE <br /> Inspection/Maintenance <br /> Labor 8 hrs 50per/hr $400 <br /> Materials $900 to replace every 3 ears - 300 LS $300 <br /> Aerial Survey Once every 5 ears $14,000/5 - 2,800 LS $2,800 <br /> Settlement Report <br /> En ineer 10 hrs 105 2er/hr $1,050 <br /> Labor 6 hrs 50per/hr $300 <br /> Subtotal $4,850 <br /> 3 VEGETATIVE COVER INSPECTION <br /> Vegetation <br /> Inspection 4 hrs 50per/hr $200 <br /> Soil Quali first 3 years only) 29 acres 25 ac $725 <br /> Rodent Control 8 hrs 50er/hr $400 <br /> Weed/Dust and Fire Control 16 hrs 30 er/hr, $480 <br /> Subtotal $1,805 <br /> 4 BENCH MAINTENANCE <br /> Inspection <br /> Labor 4 hrs 50 er/hr $200 <br /> Repair <br /> Labor/Materials - 2,000 LS $2,000 <br /> Subtotal $2,200 <br /> 5 FRENCH DRAIN LEACHATE SEEP COLLECTORS MAINTENANCE/MONITORING <br /> Ins ection and Maintenance - 400 LS $400 <br /> Leachate Sampling/Analysis - 200 LS $200 <br /> Subtotal $600 <br /> 6 DRAINAGE CONTROL SYSTEM INSPECTION AND MAINTENANCE <br /> Insp2ction 8 hrs. 50 per/hr $400 <br /> Re air - 1,500 LS $1,500 <br /> Subtotal $1,900 <br /> TOTAL ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING COSTS $16,955 <br /> TOTAL 30 YEAR POST-CLOSURE MAINTENANCE AND MONITORING COSTS $508,650 <br /> Forward Landfill PCPCMP <br /> L:\Allied\2000.193\Reports\Fina1PCPCMP:flpcxost:6/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.