Laserfiche WebLink
TABLE 4 <br /> FORWARD LANDFILL <br /> ANNUAL POST-CLOSURE MAINTENANCE AND MONITORING <br /> COST ESTIMATE SUMMARY <br /> Item Unit Price Total <br /> No. Description Quantity <br /> 5 STORMWATER MONITORING(5) <br /> System Monitoring <br /> Labor 8 hrs 45.21 perthr $362 <br /> Equipment I LS 400 $400 <br /> Materials/Laborato!y 1 LS 2,250 $2,250 <br /> Mana2ement 2 hrs 125 per/hr $250 <br /> Analysis 4 hrs 100 perthr $400 <br /> Reporting 1 LS 2,500 $2,500 <br /> Subtotal $6,162 <br /> 6 FINAL COVER SYSTEM(6) <br /> System Maintenance/Repair <br /> Inspection 8 hrs 45.21 per/hr $362 <br /> Labor 40 hrs 45.21 per/hr $1,808 <br /> IEquipment 1 LS 15,400 $15,400 <br /> Materials 1 LS 27,500 $27,500 <br /> Subtotal $45,070 <br /> 7 LANDFILL SETTLEMENT MONITORING AND MONUMENT MAINTENANCE <br /> Inspection/Maintenance <br /> Labor 16 hrs 45.21 per/hr $723 <br /> Materials($900 to replace every 3 years) - 300 LS $300 <br /> Aerial Survey(Once every 5 years)($14,000/5yrs) - 2,800 LS $2,800 <br /> Settlement Report <br /> En2ineer 8 hrs 100 per/hr $800 <br /> Subtotal $4,623 <br /> 8 VEGETATIVE COVER INSPECTION(7) <br /> Vegetation <br /> Ins p ction 16 hrs 45 per/hr $723 <br /> Hyroseed/Soil Amendments I acre(s) 4,680 ac $4,680 <br /> Rodent Control 32 hrs 1 45.21 ac <br /> $1,447 <br /> r r <br /> Weed/Dust and Fire Control 64 hrs 45.21 per/hr $2,893 <br /> 1 Subtotal $9,7" <br /> 9 ACCESS ROAD MAINTENANCE(8) <br /> Road Maintenance/Repair <br /> Inspection 8 hrs 45.21 per/hr $362 <br /> Labor 16 hrs 45.21 per/hr $723 <br /> Eq ipment I LS 3,060 $3,060 <br /> Materials 1 LS 7,000 $7,000 <br /> Subtotal $11,145 <br /> 10 DRAINAGE CONTROL SYSTEM(9) <br /> System Maintenance/Repair <br /> Inspection 32 hrs 45.21 per/hr $1,447 <br /> Labor 64 hrs 45.21 per/hr $2,893 <br /> Equipment 1 LS 0 $0 <br /> Materials 1 LS 10,765 $10,765 <br /> Subtotal $15,105 <br /> Z:XPROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\Table 4 Post Clos:7/10/2008 Page 2 of 3 <br />