Laserfiche WebLink
Part 3. FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> ®1.DESIGN(describe): <br /> ❑✓ 2.OPERATION(describe): Updated RCSI(dated July 2009)includes composting operations/activities and revised feedstock information to be reinstated. <br /> 03. OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe): <br /> 04.OTHER(describe): <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES: <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS: (Combined for Forward RRF and compost operations) <br /> 1) DISPOSAL/TRANSFER(unit): 4,180 tons per day(TPD)-(3,080 TPD for the RRF and 1,100 TPD for the compost operation) <br /> In no case will total inflow for landfill,resource recovery facility and compost facility exceed 8,668 TPD. <br /> 2) OTHER(unit) <br /> b. DAILY DESIGN TONNAGE(TPD): 4,180 tons (combined for Forward Landfill and RRF including compost operations) <br /> c. FACILITY SIZE(acres): 33.23 acres(Trans/Proc Facil-10.64 ac;Compost-22.59 ac) <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd): 150 vpd(as part of 620 vpd of combined traffic for Forward Landfill and RRF/Compost Fac.) <br /> (See RCSI Section 1.4) <br /> e. DAYS AND HOURS OF OPERATION: 6:00 a.m.to 6:00 p.m.,Monday through Saturday.The facility is closed on Sundays and four major holidays.(See RCSI <br /> Section 3.1) <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY: <br /> a. SITE STORAGE CAPACITY: 640-1,100 TPD(Compost Fac);500 TPD(Transfer/Proc Fac)(Not to exceed total combined tonnage listed above) <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> a. AVERAGE DAILY TONNAGE(TPD): <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds): <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds): <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds): <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds): <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions): <br /> g. LAST PHYSICAL SITE SURVEY(Date): <br /> h. ESTIMATED CLOSURE DATE(month and year): <br /> i. DISPOSAL FOOTPRINT(acres): <br /> j. SITE CAPACITY PLANNED(cu yds): <br /> k. 1. (i) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste): <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v): <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace): <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> ❑A. MUNICIPAL OR UTILITY SERVICE: <br /> MB.INDIVIDUAL(wells): <br /> F_�C.SURFACE SUPPLY: <br /> 1.NAME OF STREAM,LAKE,ETC. <br /> 2.TYPE OF WATER RIGHTS: <br /> r7RIPARIAN APPROPRIATION <br /> 3. STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE <br /> Page 2 <br />