Laserfiche WebLink
STATEEOF CALIFORNIA California Integrated Waste <br /> CIWMB 03 (Rev. 4/04) Management Board <br /> NSPECTION REPORT ADDENDUM PAGE 2 OF 4 - <br /> AGENCY CONDUCTING INSPECTION: San Joaquin County Environmental Health Department <br /> SITE NUMBER: 39-AA-0015 INSPECTOR: Robert McClellon <br /> SITE NAME: Forward Inc. <br /> RECEIVED BY <br /> INSPECTION DATE: 01/16/09 OPERATOR <br /> COMMENTS: <br /> l: Violation T27CCR 20921(a)2–Explosive Gas Control–The facility has explosive gas at the boundary above 5%by <br /> volume.The following perimeter gas wells were monitored.The following results were noted. <br /> GP 9 (S) 0.0%CH4 GP 11 (S) 13.2%CH4 GP 12. (S) 1.1%CH4 <br /> (1) 0.0%CH4 (1) 23.9% CH4 (1) 3.2%CH4 <br /> (D) 0.0%CH4 (D) 0.0% CH4 (D) 0.0%CH4 <br /> The facility operator needs to take the necessary steps to control the landfill gas at the boundary.Any changes or <br /> modifications to the gas extraction system must have prior approval from the S.JVAPCD and the EHD.Review the <br /> gas system operations records to determine if the gas levels are due to a line blockage or gas well field adjustment is <br /> required.Review the Operations and Maintenance(O&M)manual to determine if all the required maintenance was <br /> conducted,Evaluate the O&M manual to determine if maintenance in adequate. . <br /> 2. AC T27CCR 20921(b)–Gas Monitoring and Control–The operator submitted a report titled"Title 27 Compliance <br /> Review,Perimeter Probe Monitoring Network,Forward Landfill' on September 16,2008. The initial plan was <br /> reviewed by the EHD. The EHD requested more information regarding surrounding land uses and structures located <br /> near the landfill.The operator responded on December 12,2008.The EHD reviewed the additional information <br /> submitted and conducted a field investigation regarding the actual spacing of Gas probe distances. The following <br /> was noted: <br /> • GP 1 is l 000ft from GP25 <br /> • GP24 is 101 Oft from GP25 <br /> • <br /> GP 16 is 100 8f from GP 17 <br /> • GP3 is 998.5ft from GP4 <br /> The plan is pending final review and comment from the EHD. <br /> 3.AC T27CCR 20939(b) (1)–Sub-surface Landfill Gas Control Systems–The facility has experienced 5 subsurface <br /> landfill fires.Four of the fires occurred in this year.The fires are all located along the toe of the slope. The latest fire <br /> occurred a long the western toe of the old Forward Inc portion of the landfill. The fire occurred along the horizontal <br /> collector.The facility operator indicated that they would place soil over the area and monitor it.The operator <br /> provided a copy of the facility response plan the pertained to sub-surface landfill fires.It is currently under review.It <br /> appears that the landfill gas system is over pulling and creating fires that erupt below the surface of the landfill. The <br /> facility shall review and evaluate the gas control system to determine what can be done to prevent further instances <br /> of sub-surface landfill fires.The review and analysis of the gas extraction system shall be completed by January 30, <br /> 2009. <br /> INSPECTOR SIGNATURE: 5�.., –t'� - DATE: / D <br />