Laserfiche WebLink
California Integrated Waste Management Board <br /> ®� Disposal Facility Inspection Report (52) <br /> �1�Teurii�e'r�9 zx'"9999) °�' �nspect;`oa� d?r gca <br /> m Cid <br /> 39-AA-0015 6/10/2009 LEA Periodic <br /> ZN <br /> y <br /> ,8,� „�g, ....Y;s:. <br /> ry[g k <br /> WIN -^wT� <br /> Forward Landfill, Inc Forward, Inc./Allied Waste North America <br /> F,aa Ir cdoFa ,. .� <br /> 9999 S.Austin Road <br /> �n3Vatne <br /> Robert McClellon <br /> 7MMMEFACLMW PMMBCTFMCDMPLIN:=MMAWLr-MLESE01WMCWTMEDWMM 3DocMr=UrRE=WUR CW==(P ) Cm of nEtauut�ls lccn� <br /> AC 20939(b)(1)-Sub-surface Landfill Gas Control System;The facility has experienced 7sub-surface landfill fires in the 1as418 months.The site <br /> operator is working with the CMIMB to resolve the issue Changes have occtlred to remediate the condition(soil placed and compacted over the area <br /> where the fires have ocairred,lAlell head monitoring for temp and CO,Re-balanang the field to lower 02 in the header pipe).The site operator <br /> indicated that the sampling requested by the CIVJMB has been conducted,bu the results have not been made available.Resolution is still pending,but <br /> expected soon. <br /> The following was noted: <br /> T27CCR Section 20921 (b)-Gas Monitoring and Control-The Operator submitted an ammended plan on June 01,2009. The plan was reviewed and <br /> approved by°the EHD on June 04,2009.The installation of two Wells will be required.The date for complaince is October 18,2009. <br /> A.The daily cover consisted of mostly of,Tarp"o"matic.Soil,PGM and TASW were used to a lesser extent. The site was utilizing two working faces. <br /> One for the MSW and another for special waste and TASK <br /> B.litter was contained onsite.The use of titter fences was affective. <br /> C.The perimeter gas probes were monitored during the inspection and the.result are as follows: <br /> GP9(S)(1)(D)0.0%CH4 GPI 1(S)0.1%CH4 0)0.0%CH4(D)0.3%CH4 GP12(S)M(D)0.0%CH4 <br />