Laserfiche WebLink
Project Name FDRWMID UNDRU <br /> Inspector's Name Su W I L P SW t Pwl dVALUE <br /> Unit Tested UJ k U- W-9-A7 ENGINEERING <br /> Date --2 — -LIM I <br /> ANNUAL LCRS GAS TEST INSPECTION <br /> (C) GAS DETECTION MONITORING LOG <br /> Vacuum/blower start time: I S-e-)S— Vacuum/blower flow reading: <br /> Does the vacuum/blower reading indicate that the sump is blocked with water? Yes No_X <br /> Time Reading(pvni) Time Reading(ppm) Time Reading <br /> 2-000 <br /> ?_0 0 o <br /> IT 2rlyu <br /> E %-0-0 <br /> ;> <br /> Was gas detected from the LCRS sump? Yes No If No,complete a MWO. <br /> Comments: N <br /> Remedial Action Work Order Date Completed Signature <br /> Signature of Inspector Avvvv� <br /> Page 2 of 2 <br />