Laserfiche WebLink
Sampling Equipment <br /> j <br /> Interim gas smpling probes were used to monitor subswfice gases at thelandfill <br /> Each probe perimeter. <br /> consists of a S-foat long, YS-inch diameter stainless steel pipe, with 1-inch hales <br /> staggeredevery 2 ' es at thebottom l inches,to allaw for es'to inigratt into the prof. A <br /> pointed tip was welded to the end of the probe for better penetration. <br /> A ball valve and brass fitting were installed at the top of each probe to <br /> contain gas pressures and <br /> facilitate instrument hook-up to the probe.The valves were left closed ezc t during monitoring <br /> or instrument reading. Each probe is tagged with a brass plate and identified as "GP-1" through <br /> -GP-10- <br /> A GA-90 Landtec -red•Gas Analyzer was used to monitor methane, carbon.dioxide.(CO.�, <br /> and oxygen(O.)levels at each probe location The analyzer was calibrated for methane,CO2and <br /> 02 prior to use in the field..Cahbration.logs are.included.in this report,- <br /> Gas Monitoring <br /> Ambient air measurements of methane, oxygen, carbon dio)a ' <br /> "de; and me#zic•pressure•were r <br /> taken at each gas probe location. Those readings were recorded and the instrument- was=mn <br /> ected to the probe. "The valve was opened and pr-Dbe.gas pressure measurements were taken. <br /> The probe was then. purged fortwo. pobe volumes. <br /> Readin6 VA= then doIlected at <br /> 4PrOximately 30- to nd int ..a stable was .obtained... These <br /> measurements of methane, oxygen, carbon dioxide,and ambient barometric pressure v+tre then recorded. Monitoring was also conducted at various locations inbuilding sites for the <br /> •Presence of methane gas. Monitoring was conducted at the office trailer at the 4CIA=Ce to the <br /> landfin, trailer boxes at the service shop, and trailer boxes at the transfer building. These <br /> locations were monitored for any gas pockets at the foundation and near atryppenin.g from the <br /> Boor such as piIjing holes, electrical conduits,or floor cracks. <br /> LYS <br /> LYsilnete7rs were sampled using the following sta6dard protocol: <br /> 1. Frier to sampffng ly ° eters,the pressure-vacuum equipment is checked•and cleamed. <br /> &O-FO 112314 <br /> A•12 hely 14,2040 <br /> . .tae. <br />