Laserfiche WebLink
k <br />fl <br />C <br />r_. <br />k <br />0 <br />ii <br />YyBiweekly Forward Landfill GTF Reading$ <br />r+ProjectNumber:'M ALM <br />isin , <br />Dow4. <br />y <br />tow w — r -. -. ! / <br />Cis is ''f` <br />OF weather Conditions: --- <br />Complete Task <br />Observation <br />it (circle or record <br />ob-mervation) <br />(� <br />Inopect vaults for leaks. <br />r-. <br />teak at: EW1, EW2, iso <br />Record laimfion if <br />hupect entire GTF effluent pipehm for leaM. <br />leaks are observed <br />Observe 1 1 in siRecord <br />level <br />Inches from skid <br />OF weather Conditions: --- <br />Complete Task <br />Time GTF d Sized for inspections. Time GTP re -energized after inspections: <br />Addi ' Notes (describe any leaks, nuwlumkal probleins, malfunctioning equipment, or other issues requiring <br />' 40M� iMUSr BE M= OLTP AND F TO H WWW AT $303 . IF NOT MLIED <br />OUT, NoT28 SHOULD DESCWME DETAILED REASON. CO VE ON VCMA S Ir NEBD6D. <br />BNN MY WADS—MF (My 04 -"DDC PAGE tOF 1 <br />TOO 1E V0 M301HU DNI Iwo 99t£ £88 60Z XVd 60:ZZ 6002/TT/ZO <br />Observation <br />it (circle or record <br />ob-mervation) <br />(� <br />Inopect vaults for leaks. <br />EWJ, Isolation, EW2 <br />teak at: EW1, EW2, iso <br />Record laimfion if <br />hupect entire GTF effluent pipehm for leaM. <br />leaks are observed <br />Observe 1 1 in siRecord <br />level <br />Inches from skid <br />t—SWgUW/M=p connection (quarterly), <br />Blockage t? <br />Y (record action) / <br />aboveground der. <br />Record pipe condittion <br />torqued ® twisted / good <br />Changed Condition? <br />hupect blower support stand. <br />(cI etc.) <br />Y/ N (describe) <br />air stripper skid. <br />Changed Condition? <br />71—N (d be) <br />Check 4 sides of air shipper wit level. <br />Results <br />Gr the b artd blower motor (qu )• <br />Decouple 1-mch union from base of site glass and clean out with a brush (quarterly). <br />Discomtect effluent pipe from air stripper to fence, rap it with a ha to remove scale the <br />pipe (quarterly) - <br />Time GTF d Sized for inspections. Time GTP re -energized after inspections: <br />Addi ' Notes (describe any leaks, nuwlumkal probleins, malfunctioning equipment, or other issues requiring <br />' 40M� iMUSr BE M= OLTP AND F TO H WWW AT $303 . IF NOT MLIED <br />OUT, NoT28 SHOULD DESCWME DETAILED REASON. CO VE ON VCMA S Ir NEBD6D. <br />BNN MY WADS—MF (My 04 -"DDC PAGE tOF 1 <br />TOO 1E V0 M301HU DNI Iwo 99t£ £88 60Z XVd 60:ZZ 6002/TT/ZO <br />