My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2009_26
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2009_26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 10:55:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2009_26
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2009_26.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upper Northern Portion of WMU FU-08 September 2009 <br /> Forward Landfill Project No. 021605.09 <br /> • TABLE 3 <br /> GEOMEMBRANE CONFORMANCE TESTING SUMMARY <br /> Sample Number <br /> SAMPLE NUMBER SPEC. 907221 902211 <br /> CARBON BLACK DISPERSION ASTM D-5596 Cat 1 or 2 1 1 <br /> CARBON BLACK CONTENT(%) ASTM D-4218 2-3 2.26 2.35 <br /> DENSITY(G/CM) ASTM D-1505 0.940-0.950 0.946 0.944 <br /> TENSILE STRENGTH @ YIELD(PPI) ASTM D638 126 min. 169 157 <br /> MD/TD <br /> TENSILE STRENGTH @ BREAK(PPI) ASTM D638 90 min. 183 143 <br /> ELONG.@ YIELD(%) ASTM D638 12 17 17 <br /> ELONG. aQ BREAK(%) ASTM D638 150 478 348 <br /> ASPERITY HEIGHT(MILS) GRI GM 15 20 29 29 <br /> THICKNESS(MILS) ASTM D-1593 60 ave,54 min 64,61 63,60 <br /> Pass/Fait PASS PASS <br /> 4.2.3 Geomembrane Installation <br /> 4.2.3.1 Geomembrane Deployment <br /> Surface Preparation <br /> Prior to installation of the HDPE, Vector's CQA Monitor inspected that the <br /> subgrade was prepared as specified by the project specifications and there was no <br /> change in surface condition that required repair work. <br /> Field Panel Identification <br /> Prior to geomembrane deployment, Vector's CQA Monitor and Comanco discussed <br /> and agreed to the identification code for each panel deployed. During the <br /> deployment, Vector's CQA Monitor verified that the installer marked the panels <br /> deployed and that each panel placed was marked with the manufacturer's roll <br /> number. <br /> • <br /> Vector Engineering, Inc.• 143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.