17ECTOR <br />ENGINEERING INC. <br />0 DAILY CONSTRUCTIONREPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />011 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />15 Au 09 <br />Saturday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />Gilberto Bello <br />06:00 am to 18:30 pm <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill <br />Sunny, 90's <br />I <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS -Equipped (1); CAT 637 Scrapers (3); CAT TL943 Forklift (1); CAT 143H Grader (1); Water Truck (1) <br />Contractor morning meeting: <br />N/A <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />Guinn did not work today. <br />LINER <br />0Comanco conducted installed and tested the remainder of the geomebrane on the south and east termination berms <br />today, leaving only the area where the access ramp is currently located open. Vector marked and tested DS -4, which <br />passed. Comanco also constructed 3 pipe boots at pipe penetration points in the toe ditch along the south termination <br />berm. <br />Comanco departed site at 18:30. <br />Prepared By: Steven Rosbach Title: Senior Engineering Technician Date: 08/15/09 <br />Reviewed By: Title: <br />0 <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Date: <br />