Laserfiche WebLink
17ECTOR <br />ENGINEERING, INC. <br />0 DALY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />015 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />20 Au 09 <br />Thursday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />Gilberto Bello <br />06:00 am to 16:30 pm <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill <br />I sunny, 90's <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS -Equipped (1); CAT 637 Scrapers 3); CAT TL943 Forklift 1); CAT 143H Grader (1); Water Truck 1) <br />Contractor morning meeting: <br />N/A <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />MTRWIFIFLET40 ' <br />Guinn continued placing geotextile and drainage gravel in the NW corner of FU -08 Upper, using the belt conveyor to <br />put the gravel onto the textile, and the D6 GPS -equipped dozer to spread it to not less than 6 inches thick. Grade <br />checkers continued to check the grade ahead of the gravel placement. <br />Guinn received and placed a total of 1371 cubic yards of drainage gravel today, for a total of 5038 cubic yards placed <br />on the textile, and another 230 yards stockpiled. <br />rp 10 04'7 <br />N/A <br />Prepared By: Steven Rosbach Title: Senior Engineering Technician Date: 08/20/09 <br />Reviewed By: Title: <br />0 <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Date: <br />