Laserfiche WebLink
Ec"TOR <br />ENGINEERING, INC. <br />r <br />CONSTRUCTION DAILY REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 LJpper Portion <br />021605.09 <br />027 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />08 Se 09 <br />Tuesday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />Larry Sims <br />Gilberto Bello <br />06:00 am to 16:00 pm <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill I <br />sunny, 90's <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS -E ui d 2); CAT 637 Scra ers (3); CAT TL943 Forklift 1); CAT 143H Grader (1); Water Truck (1 <br />Contractor morning meeting: <br />N/A <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />. kTLI) 9 <br />Guinn continued bringing in protective operations layer soil from the borrow area immediately south of FU -08, using 2 <br />scrapers. Guinn rolled out sheets of geotextile over the drainage gravel, overlapping each sheet approximately 6 <br />inches, and heat tacking them together continuously with a propane torch. The protective cover soil was then pushed <br />ut over this to a one -foot thickness, using a D6 dozer equipped with GPS. <br />Guinn received 1166 yards of drainage gravel today, for a total of 12633 yards delivered and placed to date. They <br />continued to place the gravel, using the front end loader, and the GPS -equipped D6 dozer to push it out to a layer no <br />less than 6 inches thick. <br />M/ <br />Prepared By: Steven Rosbach <br />Reviewed By: <br />0 <br />Title: Senior Engineering Technician <br />IW Title: <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Date: 09/08/09 <br />Date: <br />