Laserfiche WebLink
117 <br />E "TOR <br />ENGINEERING INC. <br />0 DALY CONSTRUCTION FIELD REPORT <br />Project Name: <br />Project No. <br />Daily Field Report Sequence Number: <br />FU -08 Upper Portion <br />021605.09 <br />031 <br />Location of Work: <br />Client Or Manager <br />Date: <br />Day of The Week: <br />Manteca, CA <br />Forward Landfill <br />I Monday <br />General Contractor: <br />Liner Contractor: <br />Project Engineer: <br />Guinn Construction <br />Comanco <br />Monte Christie <br />Superintendent: <br />Liner Superintendent: <br />Hours: <br />L Sims <br />Gilberto Bello <br />06:00 am to 16:00 pm <br />Source and Description of Fill Material: <br />Weather: <br />CQA Technician: <br />On -Site Engineered Fill I <br />sunny. 90's <br />Steven Rosbach <br />Equipment on site: <br />CAT 420D Combination Loader (1); CAT 966F Front -End Loader (1); CAT CS54 Smooth Drum Compactor (1); CAT D6N Dozer, <br />GPS-Eauinned (2): CAT 637 Scrapers (3): CAT TL943 Forklift (1); CAT 143H Grader (1); Water Truck (1) <br />NOTES (Describe work completed during the day, any problems and their solutions): <br />EARTHWORKS <br />Guinn continued bringing in protective operations layer soil from the borrow area immediately south of FU -08, using 2 <br />scrapers. Guinn rolled out sheets of geotextile over the drainage gravel, overlapping each sheet approximately 6 <br />Wner'ches, and heat tacking them together continuously with a propane torch. The protective cover soil was then placed <br />this, pushed out to a one -foot thickness with a D6 dozer equipped with GPS. <br />Mel <br />N/A <br />Prepared By: Steven Rosbach <br />Reviewed By: <br />• <br />Title: Senior Engineering Technician <br />10` Title: <br />4/23/03, Rev. 0 1 of 1 <br />C-2 <br />Date: 09/14/09 <br />Date: <br />