Laserfiche WebLink
YABICTOR <br />PV ENGINEERING, INC. <br />GEOSYNTHETIC RECEIVING AND MANUFACTURING/CONFORMANCE LOG <br />(one type of material per sheet) <br />Project Name: Forward LF FU -08 Upper Material Type: Agru Microspike HDPE <br />60 Mil HDPE DS Geomembrane <br />Project No: 021605.09 Review by: MAC <br />Receiving <br />Date <br />Lot Number <br />Roll <br />Number <br />Sheet Area <br />(sf) <br />Cummulative <br />(sf) <br />MQC <br />Received <br />Date <br />MQc <br />Results <br />(P/F) <br />CQA <br />Conformance <br />Test Date Ship <br />(or NP if not <br />perform) <br />Conformance Approved for <br />Results (P/F Installation <br />or NA) (YIN) <br />1 -Jul -09 <br />7181327 <br />902211 <br />9,414 <br />9,414 <br />16 -Jun -09 <br />P <br />22 -Jun -09 <br />P <br />Y <br />1 -Jul -09 <br />7181327 <br />902212 <br />9,414 <br />18,827 <br />16 -Jun -09 <br />P <br />Y <br />1 -Jul -09 <br />7181327 <br />902213 <br />9,414 <br />28,241 <br />16 -Jun -09 <br />P <br />y <br />1 -Jul -09 <br />7181327 <br />902214 <br />9,414 <br />37,654 <br />16 -Jun -09 <br />P <br />y <br />1 -Jul -09 <br />8181175 <br />907221 <br />9,414 <br />47,068 <br />16 -Jun -09 <br />P <br />22 -Jun -09 <br />P <br />Y <br />1 -Jul -09 <br />8181175 <br />907222 <br />9,414 <br />56,482 <br />16 -Jun -09 <br />P <br />y <br />1 -Jul -09 <br />8181175 <br />907223 <br />9,414 <br />65,895 <br />16 -Jun -09 <br />P <br />Y <br />1 -Jul -09 <br />8181175 <br />907224 <br />9,414 <br />75,309 <br />16 -Jun -09 <br />P <br />y <br />1 -Jul -09 <br />8181175 <br />907225 <br />9,414 <br />84,722 <br />16 -Jun -09 <br />P <br />Y <br />Y <br />1 of 1 <br />