Laserfiche WebLink
Mr.Don Litchfield <br /> July 6,2010 <br /> Page 3 <br /> Also, during this reporting period, SCS performed monitoring of temporary subsurface evaluation <br /> probe Nos. TGP-01 through TGP-39 (Table 1). Results of this testing indicated that most of these <br /> evaluation probes exhibited methane gas concentrations above the LEL(up to 59.6 percent by <br /> volume). Note,that the methane gas concentrations at these locations,which are for evaluation <br /> purposes and are not compliance locations, have indicated a fluctuating trend. <br /> SCS is scheduled to perform third quarterly monitoring of 2010 (July through September) of the <br /> GP probes by the end of the month of September 2010. <br /> ON-SITE INTERIOR STRUCTURE TESTING <br /> In accordance with the approved testing schedule,the interiors of on-site structures are to be tested <br /> at a minimum, on a quarterly basis. On June 29, 2010, on-site structures(i.e., landfill office, <br /> portable office, scale house, locker room and supply room)were tested for the presence of <br /> methane gas. In each structure, random selected locations (i.e., electrical outlets and junction <br /> boxes, conduits, drains, floor cracks, etc.)were tested. Test results (Table 1A) indicated no <br /> methane gas was detected at any accessible location tested. <br /> SCS is scheduled to perform third quarterly monitoring of 2010 (July through September) of the <br /> interiors of on-site structures by the end of the month of September 2010. <br /> STANDARDI I <br /> This report addresses conditions at the subject site during the test dates only. Accordingly,we <br /> assume no responsibility for any changes that may occur subsequent to our monitoring which <br /> could affect the quantity of LFG at the subject site or adjacent properties. <br /> Should you have any questions, do not hesitate to contact either of the undersigned. <br /> Very truly yours, <br /> 44'V7 <br /> Whitney M. Bills Sean T. Bass <br /> Project Professional Project Manager <br /> SCS FIELD SERVICES SCS FIELD SERVICES <br /> cc: Lochlin Caffey—Keller Canyon Landfill <br />