My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2010_12
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2010_12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:35 PM
Creation date
7/3/2020 10:55:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2010_12
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2010_12.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> APPENDIX A <br /> KLEIN. ' ER.FZLD AcTrvr <br /> m PROTOCOL <br /> c Sampling andAnal Plan elder,Novemberl, i , describes haw Fo <br /> d, Inc. <br /> 8mm► monitoring for, A. The _ <br /> °on co ' ed in the Plan <br /> sqpercedes sections related to sampling and analysis in the April <br /> Addendum #i and Adden #2. 'The `oa of 1989 Pos�tcl ply <br /> -� •�° d methods and <br /> Procedures discussed in this appendix,Mcinfelder Field Activities ..tocol,are an excerpt of the <br /> more comprehensive Sampling and Analysis Plan. <br /> GROUND WATER MONITORM.G. <br /> Monitoring Wells <br /> Equipment <br /> The groundwater monitoring wells at Forward are equipped with dedicatedsubmerzed Pumps for <br /> purginj and cojjegd0A gmjMdwarersamp1m The Feld technician Perfimming the <br /> rn®alto j <br /> ring will baste a list of alt that-should be available with.which to complett.thle <br /> monitoring. ?Me nay egtnptneat is fisted below This list includes actual equipnumtused <br /> to purge and sample the wells in addition. to personal.prtiteceive gear that must be worn for <br /> protection and to reduce the potential for cross contmninadon of the wens and sampl,= Some of <br /> the iqWpment used includes various fiWramems which require, cah-bradon. <br /> Calfln-ation- <br /> procsedures are discussed below.- <br /> Calibration Procedures <br /> Many of the meters that an used in the field mast be calilwated to produce reflabl- <br /> e . The <br /> following cali'biadon rationale,procedures,and . eucy for the <br /> atcr Level Indicator <br /> Water level indicators must be calibrated regularly to that data is not - <br /> inco <br /> y clue to the tabic stretching. To calibrate the waterIM!indicator the cable is nm out <br /> to its entire lengt and measured against a tape m The 0 point is the point on the probe <br /> which completes the Circuit when conftcted by the water. completed circuit cmes the I _ <br /> 23483849-MM310MiS A-1Copyrf&200 Jay I4s <br /> XkIaMda.tic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.