Laserfiche WebLink
6 <br /> APPENDIX A <br /> KLEIN. ' ER.FZLD AcTrvr <br /> m PROTOCOL <br /> c Sampling andAnal Plan elder,Novemberl, i , describes haw Fo <br /> d, Inc. <br /> 8mm► monitoring for, A. The _ <br /> °on co ' ed in the Plan <br /> sqpercedes sections related to sampling and analysis in the April <br /> Addendum #i and Adden #2. 'The `oa of 1989 Pos�tcl ply <br /> -� •�° d methods and <br /> Procedures discussed in this appendix,Mcinfelder Field Activities ..tocol,are an excerpt of the <br /> more comprehensive Sampling and Analysis Plan. <br /> GROUND WATER MONITORM.G. <br /> Monitoring Wells <br /> Equipment <br /> The groundwater monitoring wells at Forward are equipped with dedicatedsubmerzed Pumps for <br /> purginj and cojjegd0A gmjMdwarersamp1m The Feld technician Perfimming the <br /> rn®alto j <br /> ring will baste a list of alt that-should be available with.which to complett.thle <br /> monitoring. ?Me nay egtnptneat is fisted below This list includes actual equipnumtused <br /> to purge and sample the wells in addition. to personal.prtiteceive gear that must be worn for <br /> protection and to reduce the potential for cross contmninadon of the wens and sampl,= Some of <br /> the iqWpment used includes various fiWramems which require, cah-bradon. <br /> Calfln-ation- <br /> procsedures are discussed below.- <br /> Calibration Procedures <br /> Many of the meters that an used in the field mast be calilwated to produce reflabl- <br /> e . The <br /> following cali'biadon rationale,procedures,and . eucy for the <br /> atcr Level Indicator <br /> Water level indicators must be calibrated regularly to that data is not - <br /> inco <br /> y clue to the tabic stretching. To calibrate the waterIM!indicator the cable is nm out <br /> to its entire lengt and measured against a tape m The 0 point is the point on the probe <br /> which completes the Circuit when conftcted by the water. completed circuit cmes the I _ <br /> 23483849-MM310MiS A-1Copyrf&200 Jay I4s <br /> XkIaMda.tic. <br />