Laserfiche WebLink
Disposal Facility Inspection Report (52) <br /> OR <br /> 39-AA-0015 3/17/2010 . LFA Periodic <br /> Forward Landfill, Inc. Forward, Inc./Allied Waste North America <br /> r. <br /> 9999 S.Austin Road, Manteca 95336 <br /> Robert McClellon <br /> THEABCVEPAWHYWAB FAR %W=WRHAPPUCRBLE BE=WS OFTHEDWOM 300F75®PMM CODE"gADTMuANo THLETr CM1POlM=E OF REBtEATiW18 <br /> 110111 U! U;ii iii 101:1 ii I MEN <br /> KOM <br /> X 20820-Drainage/Erosion Control <br /> Comments:The facility has ponding that Is oc curing throughout the facility.There are small areas of ponding on the old Forward site.The <br /> erosion rills are being repaired as the site drys up.A follow up site visit on March 18,2010,revealed that progress has been made on the <br /> eliminating the ponding.This item will be checked on the next month inspection. <br /> X 20921-Gas Monitoring and Control <br /> Comments:The facility has methane above 5%at the boundary.The perimeter probe GP 11 (s)measured 13.2%CH4(1)measured 20.00/6 <br /> CH4 on the Gastech-GEM 2000. The facility is experencing water blocakges due to the malfunction of a laec hate sump pump. The pump- <br /> needs to be repaired as soon as possible.The facility should considered maunaully pumping the condensate to allow the extraction system <br /> Ito operate properly.Do so by April 15,2010. <br /> A routine inspection was conducted this date and the following was noted: <br /> 1.There was a light tower that was facing East.The light was facing oncoming air traffic.Move the light tower to direct the light West or North. <br /> 2.Site users from BND and SRI trucking did not use their hard hats.It is Important that all safety gear be worn while the drivers are out of the vehicles. <br /> 3.The perimeter gas probes were sampled during the inspection.The result are as follows: <br /> GP9(s)(ixd)0.0%CH4 <br /> GP11 (s)132%CH4-(i)20.0%CH4-(d)0.0%CH4 <br /> GP12(s)0.3%CH4(1)0.1%CH4-(d)0.0%CH4 <br />